Reject Station
AssemblyInspects and air-blasts out bottles that fail fill or cap checks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Reject Station
4 top-level lines as of r119522| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Inspection Sensor | packaging-filling-line-inspection-sensor | 2× | 2 | · | part |
| 2 | Pneumatic Cylinder | pneumatic-cylinder | 1× | 1 | · | part |
| 3 | Reject Bin | packaging-filling-line-reject-bin | 1× | 1 | · | part |
| 4 | Limit Switch | limit-switch | 1× | 1 | · | part |