BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Film Clamp and Cut Unit

Assembly

Automates the cycle ends: grips the film tail at start, then cuts and wipes it onto the load at finish. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Film Clamp and Cut Unit parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Film Clamp and Cut Unit parts diagram: 1 film clamp, 2 hot-wire cutter, 3 wipe-on brush, 4 clamp actuator, 5 thermal fuse. 5 parts in 5 top-level items.
Film Clamp and Cut Unit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Film Clamp 1× Pneumatic or electric gripper in the base holding the film tail for the first wrap revolutions.
2 Hot-Wire Cutter 1× film cutter
3 Wipe-On Brush 1× tail press-on
4 Clamp Actuator 1× Small electric actuator opening and closing the clamp jaw on logic command.
5 Thermal Fuse 1× hot-wire overtemperature protection

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Film Clamp and Cut Unit

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Film Clamp pallet-wrapper-film-clamp 1× 1 · part
2 Hot-Wire Cutter pallet-wrapper-hot-wire 1× 1 · part
3 Wipe-On Brush pallet-wrapper-wipe-brush 1× 1 · part
4 Clamp Actuator pallet-wrapper-clamp-actuator 1× 1 · part
5 Thermal Fuse thermal-fuse 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the film clamp and cut unit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks