BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Runout and Conveyor

Assembly

Catches the cut tubes off the mandrel and carries them away to dry and be collected. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Runout and Conveyor parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Runout and Conveyor parts diagram: 1 runout trough, 2 tube kicker, 3 take-away conveyor, 4 drive belt. 4 parts in 4 top-level items.
Runout and Conveyor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Runout Trough 1× Runout trough
2 Tube Kicker 1× Tube kicker
3 Take-Away Conveyor 1× Take-away conveyor
4 Drive Belt 1× Conveyor belt drive

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Runout and Conveyor

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Runout Trough paper-tube-winding-machine-runout-trough 1× 1 · part
2 Tube Kicker paper-tube-winding-machine-kicker 1× 1 · part
3 Take-Away Conveyor paper-tube-winding-machine-conveyor 1× 1 · part
4 Drive Belt drive-belt 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the runout and conveyor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks