Frame and Guarding

Assembly

The welded 304 stainless washdown frame, drip tray, and guard doors that carry the hopper, piston block, and nozzles. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame and Guarding parts and their functions

7 top-level parts · 15 parts in total · full bill of materials below
Frame and Guarding parts diagram: 1 base weldment, 2 leveling foot, 3 drip tray, 4 guard door, 5 door interlock, 6 sheet metal panel, 7 fastener set. 15 parts in 7 top-level items.
Frame and Guarding parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Weldment 1× Stainless base weldment
2 Leveling Foot 4× Leveling feet
3 Drip Tray 1× Sloped drip tray
4 Guard Door 2× Interlocked guard doors
5 Door Interlock 2× Safety interlocks
6 Sheet Metal Panel 4× Guard panels
7 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame and Guarding

7 top-level lines · 7 rows shown · 15 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Weldment piston-filling-machine-base-weldment 1× 1 · part
2 Leveling Foot piston-filling-machine-leveling-foot 4× 4 · part
3 Drip Tray piston-filling-machine-drip-tray 1× 1 · part
4 Guard Door piston-filling-machine-guard-door 2× 2 · part
5 Door Interlock piston-filling-machine-door-interlock 2× 2 · part
6 Sheet Metal Panel sheet-panel 4× 4 · part
7 Fastener Set fastener-set 1× 1 · part

Where the frame and guarding is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks