BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Nesting Table

Assembly

Precision-guided saddle structure that aligns incoming signatures and delivers them to the stitching head. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Nesting Table parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Nesting Table parts diagram: 1 saddle v-guide, 2 saddle pusher arm, 3 saddle pusher motor, 4 pusher position encoder, 5 lift cylinder. 5 parts in 5 top-level items.
Nesting Table parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Saddle V-Guide 1× V-block positioning spine centerline
2 Saddle Pusher Arm 1× Indexes saddle position per stitch
3 Saddle Pusher Motor 1× Drives saddle advancement
4 Pusher Position Encoder 1× Monitors saddle position
5 Lift Cylinder 1× Raises finished product off saddle

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Nesting Table

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Saddle V-Guide saddle-stitcher-saddle-guide 1× 1 · part
2 Saddle Pusher Arm saddle-stitcher-saddle-pusher-arm 1× 1 · part
3 Saddle Pusher Motor saddle-stitcher-pusher-motor 1× 1 · part
4 Pusher Position Encoder saddle-stitcher-pusher-encoder 1× 1 · part
5 Lift Cylinder saddle-stitcher-lift-cylinder 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the nesting table is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks