Frame and Guarding
AssemblyThe welded stainless frame, leveling feet, and interlocked guard doors that carry the turret and every process station. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Frame and Guarding parts and their functions
6 top-level parts · 20 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Weldment | 1× | Stainless base weldment |
| 2 | Leveling Foot | 6× | Leveling feet |
| 3 | Guard Door | 3× | Interlocked guard doors |
| 4 | Guard Panel | 6× | Fixed guard panels |
| 5 | Door Interlock | 3× | Safety interlocks |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Frame and Guarding
6 top-level lines · 6 rows shown · 20 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Weldment | spout-pouch-capper-base-weldment | 1× | 1 | · | part |
| 2 | Leveling Foot | spout-pouch-capper-leveling-foot | 6× | 6 | · | part |
| 3 | Guard Door | spout-pouch-capper-guard-door | 3× | 3 | · | part |
| 4 | Guard Panel | spout-pouch-capper-guard-panel | 6× | 6 | · | part |
| 5 | Door Interlock | spout-pouch-capper-door-interlock | 3× | 3 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the frame and guarding is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |