BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r162799 of this page, not the current version. Go to current · history

Pouch Opening Station

Assembly

The vacuum cups and opening fingers that pull the two pouch films apart at the corner so a spout can enter between them. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Pouch Opening Station

5 top-level lines as of r162799
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vacuum Cup spout-pouch-capper-vacuum-cup 2× 2 · part
2 Vacuum Generator spout-pouch-capper-vacuum-pump 1× 1 · part
3 Opening Finger spout-pouch-capper-opening-finger 2× 2 · part
4 Finger Cylinder spout-pouch-capper-finger-cylinder 1× 1 · part
5 Open Sensor spout-pouch-capper-open-sensor 1× 1 · part