BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Bottom Film Feed

Assembly

Unwinds the heavy forming film that becomes the tray and feeds it into the gripper chains. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bottom Film Feed parts and their functions

3 top-level parts · 5 parts in total · full bill of materials below
Bottom Film Feed parts diagram: 1 bottom film reel, 2 dancer arm, 3 guide roller. 5 parts in 3 top-level items.
Bottom Film Feed parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bottom Film Reel 1× Bottom film reel
2 Dancer Arm 1× Dancer arm
3 Guide Roller 3× Guide rollers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Bottom Film Feed

3 top-level lines · 3 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bottom Film Reel thermoform-fill-seal-machine-bottom-reel 1× 1 · part
2 Dancer Arm thermoform-fill-seal-machine-bottom-dancer 1× 1 · part
3 Guide Roller thermoform-fill-seal-machine-bottom-roller 3× 3 · part

Where the bottom film feed is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks