Rail Threading System
AssemblyRoller guides and clamps that pick up the long-welded rails lying beside the formation, bend them through a controlled S-curve, and set them onto the fresh sleepers at gauge. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Rail Threading System
7 top-level lines as of r174922| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Rail Roller Guide | track-laying-machine-rail-roller-guide | 8× | 8 | · | part |
| 2 | Rail Pull Clamp | track-laying-machine-rail-clamp | 4× | 4 | · | part |
| 3 | Gauge Head | track-laying-machine-gauge-head | 2× | 2 | · | part |
| 4 | Rail Lifting Tongs | track-laying-machine-rail-tongs | 2× | 2 | · | part |
| 5 | Fastening Station | track-laying-machine-fastening-station | 1× | 1 | · | part |
| 6 | Ball Bearing | ball-bearing | 16× | 16 | · | part |
| 7 | Hall Sensor | hall-sensor | 2× | 2 | · | part |