BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Environmental Enclosure

Assembly

Partial or full enclosure reducing dust ingestion and containing UV light for safety. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Environmental Enclosure parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Environmental Enclosure parts diagram: 1 enclosure frame, 2 enclosure panel, 3 safety access door, 4 air intake filter. 7 parts in 4 top-level items.
Environmental Enclosure parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Enclosure Frame 1× Aluminum extrusion frame
2 Enclosure Panel 4× Polycarbonate or acrylic UV-blocking panels
3 Safety Access Door 1× Hinged access with interlock sensor
4 Air Intake Filter 1× HEPA filter reducing dust

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Environmental Enclosure

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Enclosure Frame uv-flatbed-printer-enclosure-frame 1× 1 · part
2 Enclosure Panel uv-flatbed-printer-enclosure-panel 4× 4 · part
3 Safety Access Door uv-flatbed-printer-safety-door 1× 1 · part
4 Air Intake Filter uv-flatbed-printer-air-filter 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the environmental enclosure is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks