Arch Assembly
AssemblyForms the band into an open loop around the product and guides it back to the seal head. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Arch Assembly parts and their functions
3 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Loop Former 3 parts | 1× | Pushes band around the arch |
| 2 | Band Guide Arch 3 parts | 1× | Band channel around the work zone |
| 3 | Arch Gate | 1× | Releases the loop onto the product |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Arch Assembly
3 top-level lines · 9 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Loop Former 3 parts | banding-machine-loop-former | 1× | 1 | 6 | assembly |
| 1.1 | Loop Belt | banding-machine-loop-belt | 1× | 1 | · | part |
| 1.2 | Drive Belt | drive-belt | 1× | 1 | · | part |
| 1.3 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 2 | Band Guide Arch 3 parts | banding-machine-band-guide-arch | 1× | 1 | 4 | assembly |
| 2.1 | Arch Channel | banding-machine-arch-channel | 2× | 2 | · | part |
| 2.2 | Arch Window | banding-machine-arch-window | 1× | 1 | · | part |
| 2.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3 | Arch Gate | banding-machine-arch-gate | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the arch assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |