Steel Structure
AssemblyMain load-bearing steel frame: legs, sill beams, boom, girder, A-frame and machinery house. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Steel Structure parts and their functions
7 top-level parts · 37 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Support Leg | 4× | Welded box-section portal leg. |
| 2 | Sill Beam | 2× | Lower cross beam tying the legs to the bogies. |
| 3 | Boom 2 parts | 1× | Cantilevered seaward boom that raises and lowers over the ship. |
| 4 | Main Girder | 1× | Horizontal trolley runway girder. |
| 5 | A-Frame | 1× | Apex tower supporting boom-hoist sheaves and ties. |
| 6 | Machinery House 2 parts | 1× | Enclosed house atop the crane holding hoist and electrical machinery. |
| 7 | Fastener Set | 8× | structural bolting |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Steel Structure
7 top-level lines · 11 rows shown · 37 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Support Leg | container-crane-leg | 4× | 4 | · | part |
| 2 | Sill Beam | container-crane-sill-beam | 2× | 2 | · | part |
| 3 | Boom 2 parts | container-crane-boom | 1× | 1 | 5 | assembly |
| 3.1 | Boom Section | container-crane-boom-section | 1× | 1 | · | part |
| 3.2 | Boom Hoist Rope | container-crane-boom-hoist-rope | 4× | 4 | · | part |
| 4 | Main Girder | container-crane-main-girder | 1× | 1 | · | part |
| 5 | A-Frame | container-crane-a-frame | 1× | 1 | · | part |
| 6 | Machinery House 2 parts | container-crane-machinery-house | 1× | 1 | 16 | assembly |
| 6.1 | Cladding Panel | container-crane-cladding-panel | 12× | 12 | · | part |
| 6.2 | Fastener Set | fastener-set | 4× | 4 | · | part |
| 7 | Fastener Set | fastener-set | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the steel structure is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |