Product

Overview

A coal yard stacker is a continuous bulk material handling machine that builds coal stockpiles in an open or covered storage yard. Coal arrives by an incoming yard conveyor, transfers onto a belt conveyor mounted along a long boom, and is thrown off the boom head into a growing pile. The machine moves on rails laid along the length of the yard, and the boom both luffs (raises and lowers) and slews (rotates) so the discharge point can be placed anywhere across the stockpile footprint. By combining travel, slew and luffing motion the operator lays coal in controlled layers rather than dumping it at a single point, which keeps the pile dense, stable and free of large voids.

Stackers of this class handle boom belt widths from 1,200 to 2,000 mm running at 3 to 5 m/s, giving throughputs of 500 to 6,000 t/h. Boom length runs from 25 m on a small power-plant yard to 50 m on a port or large mine stockyard. The whole machine, often 120 to 450 t, rides on a rail-mounted undercarriage at 15 to 30 m/min and is powered through a trailing cable managed by a cable reel.

Material flow

Coal reaches the machine on the yard conveyor running between the rails. A tripper car lifts that belt and discharges into the feed chute, which directs the stream through a receiving hopper and onto the tail end of the boom belt. The transfer point is where most wear and dust occur, so it carries impact idlers, a skirted loading zone and a dust suppression spray.

The boom conveyor then carries the coal up the inclined boom. Troughing carry idlers hold the loaded belt in a deep trough to maximise cross-sectional load, while return idlers support the empty belt underneath. At the boom head a rubber-lagged drive pulley turns the belt, and coal leaves through the discharge chute into the pile. Belt scrapers on the head pulley clean off carryback before the belt returns to the tail.

Motion systems

Three powered motions place the discharge point. Slewing rotates the whole superstructure on a large slew bearing, a triple-row roller ring with integral gear teeth. Two slew drive units, each a brake motor and planetary gearbox driving a pinion into the ring, give a typical swing of ±110°. A slip ring column passes power and control signals across the rotating joint.

Luffing sets the height and reach of the discharge point. Two double-acting hydraulic cylinders raise and lower the boom between about +12° and -12°. A counterbalance valve block holds the boom against gravity and lowers it under control, and pressure sensors feed boom load and angle back to the controller. Oil comes from the hydraulic power unit, a variable-displacement pump and reservoir with filtration and an accumulator.

Travel moves the machine along the yard. Four rail bogies carry double-flanged wheels, and two geared travel drives move the machine at 15 to 30 m/min. When parked, spring-applied rail clamps grip the rail so wind cannot push the machine, and buffers limit overtravel at the rail ends.

Stacking methods

Two pile shapes are common. In cone stacking the machine stands still and slews while luffing down as the cone grows, building one conical pile, then travels a boom diameter and starts the next, producing a row of overlapping cones. In chevron or windrow stacking the machine travels back and forth along a fixed line while the boom discharges at the ridge, laying coal in thin V-shaped layers along a long prism. Chevron piles blend coal grades layer by layer, which matters when a power plant or coke oven needs a consistent feed. The counterweight, a 40 to 150 t concrete and steel mass on the tail of the platform, balances the boom moment about the slew centre across the full luffing range so the slew bearing load stays within limits.

Control and electrical

The control system coordinates all motion and protects the machine. A PLC reads a boom angle sensor, a slew encoder and a belt speed sensor, then drives the travel and slew motors through variable-frequency drives in the motor control centre. Limit switches stop each motion at its end of travel, and interlocks prevent stacking while the boom is above safe load or the cable reel is at its limit. The operator works from an air-conditioned cab with an LCD display, though modern machines run most stacking sequences automatically.

Maintenance and common failures

Idlers are the highest-count wear item: seized carry idlers cut belt grooves and add drag, so they are inspected on a route and changed in bulk. The boom belt itself is a major spare, replaced on a multi-year cycle or after a rip; steel-cord construction resists the impact at the loading zone. Scraper blades wear fast in abrasive coal and are swapped on a short interval to control carryback. The slew bearing needs scheduled greasing and periodic bolt-tension checks, since a neglected ring is expensive to replace. On the hydraulics, cylinder rod seals weep with age and the return filter is changed on condition. Rail clamps and travel wheel flanges are checked for wear because a stacker that drifts in a storm or derails on a worn rail is a serious hazard. Dust suppression nozzles clog and are cleaned routinely to keep airborne coal dust within limits.

Coal Yard Stacker parts and their functions

9 top-level parts · 571 parts in total · full bill of materials below
Coal Yard Stacker parts diagram: 1 boom conveyor, 2 slewing superstructure, 3 luffing system, 4 travel undercarriage, 5 counterweight assembly, 6 machinery house and cab, 7 feed transfer point, 8 hydraulic power unit, 9 electrical and controls. 571 parts in 9 assemblies.
Coal Yard Stacker parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boom Conveyor 13 parts Belt conveyor along the boom delivering coal to the discharge point
2 Slewing Superstructure 5 parts Slewing platform carrying the boom and machinery house
3 Luffing System 5 parts Hydraulic luffing cylinders raising and lowering the boom
4 Travel Undercarriage 6 parts Rail-mounted travel chassis with bogies and drives
5 Counterweight Assembly 3 parts Counterweight balancing the boom moment about the slew axis
6 Machinery House and Cab 5 parts Enclosure for drives and the operator cab
7 Feed Transfer Point 4 parts Receiving point where the yard conveyor feeds the boom belt
8 Hydraulic Power Unit 7 parts Hydraulic power pack for luffing and rail clamps
9 Electrical and Controls 9 parts PLC, cable reel and field instrumentation

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Coal Yard Stacker

9 top-level lines · 131 rows shown · 571 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boom Conveyor 13 parts coal-handling-stacker-boom-conveyor 1 151 assembly
1.1 Boom Structure coal-handling-stacker-boom-structure 1 · part
1.2 Boom Conveyor Belt coal-handling-stacker-conveyor-belt 1 · part
1.3 Carry Idler Set coal-handling-stacker-carry-idler 60× 60 · part
1.4 Return Idler Roll coal-handling-stacker-return-idler 24× 24 · part
1.5 Impact Idler Set coal-handling-stacker-impact-idler 6 · part
1.6 Head (Drive) Pulley 3 parts coal-handling-stacker-head-pulley 1 4 assembly
1.6.1 Pulley Shell coal-handling-stacker-pulley-shell 1 · part
1.6.2 Pulley Shaft coal-handling-stacker-pulley-shaft 1 · part
1.6.3 Ball Bearing ball-bearing 2 · part
1.7 Tail Pulley 3 parts coal-handling-stacker-tail-pulley 1 4 assembly
1.7.1 Pulley Shell coal-handling-stacker-pulley-shell 1 · part
1.7.2 Pulley Shaft coal-handling-stacker-pulley-shaft 1 · part
1.7.3 Ball Bearing ball-bearing 2 · part
1.8 Take-up Pulley 4 parts coal-handling-stacker-takeup-pulley 1 5 assembly
1.8.1 Pulley Shell coal-handling-stacker-pulley-shell 1 · part
1.8.2 Pulley Shaft coal-handling-stacker-pulley-shaft 1 · part
1.8.3 Ball Bearing ball-bearing 2 · part
1.8.4 Take-up Frame coal-handling-stacker-takeup-frame 1 · part
1.9 Bend / Snub Pulley 3 parts coal-handling-stacker-bend-pulley 2 4 assembly
1.9.1 Pulley Shell coal-handling-stacker-pulley-shell 2 · part
1.9.2 Pulley Shaft coal-handling-stacker-pulley-shaft 2 · part
1.9.3 Ball Bearing ball-bearing 4 · part
1.10 Belt Drive Unit 7 parts coal-handling-stacker-belt-drive 1 34 assembly
1.10.1 Conveyor Drive Motor 3 parts + deeper › coal-handling-stacker-drive-motor 1 24 assembly
1.10.2 Helical Gear Pair gear-pair 1 · part
1.10.3 Gearbox Housing gearbox-housing 1 · part
1.10.4 Ball Bearing ball-bearing 4 · part
1.10.5 Oil Seal oil-seal 2 · part
1.10.6 Fluid Coupling coal-handling-stacker-fluid-coupling 1 · part
1.10.7 Backstop coal-handling-stacker-backstop 1 · part
1.11 Belt Scraper coal-handling-stacker-belt-scraper 2 · part
1.12 Discharge Chute coal-handling-stacker-discharge-chute 1 · part
1.13 Skirtboard and Seal coal-handling-stacker-belt-skirt 1 · part
2 Slewing Superstructure 5 parts coal-handling-stacker-slewing-superstructure 1 78 assembly
2.1 Slew Platform coal-handling-stacker-slew-platform 1 · part
2.2 Slew Bearing coal-handling-stacker-slew-bearing 1 · part
2.3 Slew Drive Unit 6 parts coal-handling-stacker-slew-drive 2 32 assembly
2.3.1 Slew Motor 3 parts + deeper › coal-handling-stacker-slew-motor 2 24 assembly
2.3.2 Helical Gear Pair gear-pair 2 · part
2.3.3 Gearbox Housing gearbox-housing 2 · part
2.3.4 Slew Pinion coal-handling-stacker-slew-pinion 2 · part
2.3.5 Ball Bearing ball-bearing 6 · part
2.3.6 Oil Seal oil-seal 4 · part
2.4 Slip Ring Column 3 parts coal-handling-stacker-slip-ring 1 10 assembly
2.4.1 Slip Ring Stack coal-handling-stacker-slip-ring-stack 1 · part
2.4.2 Wire Bundle wire-bundle 1 · part
2.4.3 Connector connector 8 · part
2.5 Boom Hinge Pin coal-handling-stacker-boom-hinge-pin 2 · part
3 Luffing System 5 parts coal-handling-stacker-luffing-system 1 19 assembly
3.1 Luffing Cylinder 4 parts coal-handling-stacker-luffing-cylinder 2 4 assembly
3.1.1 Cylinder Barrel coal-handling-stacker-cylinder-barrel 2 · part
3.1.2 Cylinder Rod coal-handling-stacker-cylinder-rod 2 · part
3.1.3 Cylinder Piston coal-handling-stacker-cylinder-piston 2 · part
3.1.4 O-Ring Set oring-set 2 · part
3.2 Luffing Pin coal-handling-stacker-luffing-pin 4 · part
3.3 Luffing Valve Block coal-handling-stacker-luffing-valve-block 1 · part
3.4 Pressure Sensor pressure-sensor 2 · part
3.5 Luffing Hydraulic Hose coal-handling-stacker-luffing-hose 4 · part
4 Travel Undercarriage 6 parts coal-handling-stacker-travel-undercarriage 1 101 assembly
4.1 Portal Frame coal-handling-stacker-portal-frame 1 · part
4.2 Travel Bogie 3 parts coal-handling-stacker-travel-bogie 4 7 assembly
4.2.1 Travel Wheel coal-handling-stacker-travel-wheel 8 · part
4.2.2 Bogie Frame coal-handling-stacker-bogie-frame 4 · part
4.2.3 Ball Bearing ball-bearing 16 · part
4.3 Travel Drive Unit 5 parts coal-handling-stacker-travel-drive 2 31 assembly
4.3.1 Travel Motor 3 parts + deeper › coal-handling-stacker-travel-motor 2 24 assembly
4.3.2 Helical Gear Pair gear-pair 2 · part
4.3.3 Gearbox Housing gearbox-housing 2 · part
4.3.4 Ball Bearing ball-bearing 6 · part
4.3.5 Oil Seal oil-seal 4 · part
4.4 Rail Clamp coal-handling-stacker-rail-clamp 2 · part
4.5 Travel Buffer coal-handling-stacker-buffer 4 · part
4.6 Rail Cleaner coal-handling-stacker-rail-cleaner 4 · part
5 Counterweight Assembly 3 parts coal-handling-stacker-counterweight 1 3 assembly
5.1 Counterweight Block coal-handling-stacker-counterweight-block 1 · part
5.2 Counterweight Frame coal-handling-stacker-counterweight-frame 1 · part
5.3 Fastener Set fastener-set 1 · part
6 Machinery House and Cab 5 parts coal-handling-stacker-machinery-house 1 19 assembly
6.1 Machinery House Frame coal-handling-stacker-house-frame 1 · part
6.2 Sheet Metal Panel sheet-panel 12× 12 · part
6.3 Operator Cab 4 parts coal-handling-stacker-operator-cab 1 4 assembly
6.3.1 Cab Shell coal-handling-stacker-cab-shell 1 · part
6.3.2 Operator Console coal-handling-stacker-operator-console 1 · part
6.3.3 LCD Panel lcd-panel 1 · part
6.3.4 Operator Seat coal-handling-stacker-operator-seat 1 · part
6.4 Cab HVAC Unit coal-handling-stacker-hvac-unit 1 · part
6.5 Access Stairway coal-handling-stacker-access-stair 1 · part
7 Feed Transfer Point 4 parts coal-handling-stacker-feed-transfer 1 18 assembly
7.1 Tripper Car 4 parts coal-handling-stacker-tripper-car 1 15 assembly
7.1.1 Tripper Frame coal-handling-stacker-tripper-frame 1 · part
7.1.2 Tripper Pulley coal-handling-stacker-tripper-pulley 2 · part
7.1.3 Travel Wheel coal-handling-stacker-travel-wheel 4 · part
7.1.4 Ball Bearing ball-bearing 8 · part
7.2 Feed Chute coal-handling-stacker-feed-chute 1 · part
7.3 Feed Hopper coal-handling-stacker-feed-hopper 1 · part
7.4 Dust Suppression Unit coal-handling-stacker-dust-suppression 1 · part
8 Hydraulic Power Unit 7 parts coal-handling-stacker-hydraulic-power-unit 1 31 assembly
8.1 Hydraulic Pump coal-handling-stacker-hydraulic-pump 1 · part
8.2 HPU Drive Motor 3 parts coal-handling-stacker-hpu-motor 1 24 assembly
8.2.1 Stator Assembly 3 parts + deeper › stator-assembly 1 3 assembly
8.2.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1 19 assembly
8.2.3 Ball Bearing ball-bearing 2 · part
8.3 Hydraulic Reservoir coal-handling-stacker-hydraulic-tank 1 · part
8.4 Hydraulic Filter coal-handling-stacker-hydraulic-filter 2 · part
8.5 Hydraulic Accumulator coal-handling-stacker-accumulator 1 · part
8.6 Pressure Sensor pressure-sensor 1 · part
8.7 O-Ring Set oring-set 1 · part
9 Electrical and Controls 9 parts coal-handling-stacker-electrical-controls 1 151 assembly
9.1 PLC Cabinet 5 parts coal-handling-stacker-plc-cabinet 1 95 assembly
9.1.1 Bare PCB pcb-bare 1 · part
9.1.2 Microcontroller mcu 1 · part
9.1.3 SMD Passive (R/C/L) smd-passives 80× 80 · part
9.1.4 Relay relay 12× 12 · part
9.1.5 Power Supply power-supply 1 · part
9.2 Motor Control Centre 4 parts coal-handling-stacker-mcc 1 17 assembly
9.2.1 Variable-Frequency Drive coal-handling-stacker-vfd 4 · part
9.2.2 Relay relay 8 · part
9.2.3 Power Supply power-supply 1 · part
9.2.4 Sheet Metal Panel sheet-panel 4 · part
9.3 Cable Reel 4 parts coal-handling-stacker-cable-reel 1 5 assembly
9.3.1 Cable Reel Drum coal-handling-stacker-reel-drum 1 · part
9.3.2 Cable Reel Motor coal-handling-stacker-reel-motor 1 · part
9.3.3 Slip Ring Stack coal-handling-stacker-slip-ring-stack 1 · part
9.3.4 Ball Bearing ball-bearing 2 · part
9.4 Boom Angle Sensor coal-handling-stacker-boom-angle-sensor 1 · part
9.5 Slew Encoder coal-handling-stacker-slew-encoder 1 · part
9.6 Belt Speed Sensor coal-handling-stacker-belt-speed-sensor 1 · part
9.7 Limit Switch coal-handling-stacker-limit-switch 6 · part
9.8 Wire Bundle wire-bundle 1 · part
9.9 Connector connector 24× 24 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2k–$300k. How estimates work
VendorHQSpecialtyMOQLead time
toyota-industries.com ↗ Kariya, JP Forklifts & logistics 20 units 10–16 wks
🇩🇪KION Group
kiongroup.com ↗
Frankfurt, DE Forklifts (Linde, STILL) 20 units 10–16 wks
🇩🇪Jungheinrich
jungheinrich.com ↗
Hamburg, DE Warehouse trucks 20 units 10–16 wks
crown.com ↗ New Bremen, US Forklifts 20 units 10–16 wks
🇨🇳Hangcha
hcforklift.com ↗
Hangzhou, CN Forklifts & material handling 20 units 10–16 wks

1,113-word article