BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Safety Systems

Assembly

Mechanical and hydraulic protections against deck free fall, under-deck entry and trailer departure. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Safety Systems parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Safety Systems parts diagram: 1 safety leg, 2 maintenance strut, 3 cross-traffic support, 4 night lock, 5 coil spring. 7 parts in 5 top-level items.
Safety Systems parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Safety Leg 2× mechanical fall supports
2 Maintenance Strut 1× lockout prop for service
3 Cross-Traffic Support 1× supports deck at dock level
4 Night Lock 1× secures stored position
5 Coil Spring 2× safety-leg return springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Safety Systems

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Safety Leg dock-leveler-safety-leg 2× 2 · part
2 Maintenance Strut dock-leveler-maintenance-strut 1× 1 · part
3 Cross-Traffic Support dock-leveler-cross-traffic-leg 1× 1 · part
4 Night Lock dock-leveler-night-lock 1× 1 · part
5 Coil Spring coil-spring 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the safety systems is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks