Chassis & Covers
AssemblyWelded frame with battery compartment, floor plate, hoods and covers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Chassis & Covers parts and their functions
6 top-level parts · 704 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chassis Frame | 1× | Welded steel frame carrying the mast, axles, battery compartment and counterweight. |
| 2 | Cover Panel | 9× | Steel or plastic hood, side cover or floor plate. |
| 3 | Hinge & Latch | 14× | Hinge, gas strut or latch on a cover. |
| 4 | Hex Bolt | 320× | Flanged hex bolt, M8 to M24, used throughout the structure, covers and equipment mounts. |
| 5 | Hex Nut | 180× | Flanged or nyloc hex nut mating the bolts. |
| 6 | Washer | 180× | Flat or spring washer under bolt heads and nuts. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Chassis & Covers
6 top-level lines · 6 rows shown · 704 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chassis Frame | forklift-chassis-frame | 1× | 1 | · | part |
| 2 | Cover Panel | forklift-cover-panel | 9× | 9 | · | part |
| 3 | Hinge & Latch | forklift-hinge-latch | 14× | 14 | · | part |
| 4 | Hex Bolt | forklift-hex-bolt | 320× | 320 | · | part |
| 5 | Hex Nut | forklift-hex-nut | 180× | 180 | · | part |
| 6 | Washer | forklift-washer | 180× | 180 | · | part |
Where the chassis & covers is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |