Hydraulic Leg Tower
AssemblyTelescoping box-section tower with an internal lift cylinder, raising loads of 100-1000 t in stepped stages. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hydraulic Leg Tower parts and their functions
5 top-level parts · 14 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Column Section | 1× | Fixed base column section |
| 2 | Telescoping Section | 3× | Telescoping inner sections |
| 3 | Stage Locking Pin | 8× | Stage locking pins |
| 4 | Foot Pad | 1× | Load distribution foot pad |
| 5 | Leg Tilt Sensor | 1× | Leg tilt sensor |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hydraulic Leg Tower
5 top-level lines · 5 rows shown · 14 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Column Section | heavy-lift-gantry-base-section | 1× | 1 | · | part |
| 2 | Telescoping Section | heavy-lift-gantry-telescope-section | 3× | 3 | · | part |
| 3 | Stage Locking Pin | heavy-lift-gantry-stage-pin | 8× | 8 | · | part |
| 4 | Foot Pad | heavy-lift-gantry-leg-pad | 1× | 1 | · | part |
| 5 | Leg Tilt Sensor | heavy-lift-gantry-tilt-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hydraulic leg tower is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |