Carrier Train
AssemblyClosed loop of 24-80 shelved bin carriers hung from trolleys and linked into a continuous train. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Carrier Train
4 top-level lines as of r83810| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bin Carrier 4 parts | horizontal-carousel-carrier | 40× | 40 | 0 | assembly |
| 2 | Carrier Link | horizontal-carousel-carrier-link | 40× | 40 | · | part |
| 3 | Carrier Trolley 3 parts | horizontal-carousel-trolley | 40× | 40 | 0 | assembly |
| 4 | Bottom Guide Shoe | horizontal-carousel-bottom-guide | 40× | 40 | · | part |