Crane Electrification
AssemblyPower delivery from the building supply to the moving bridge and trolley via conductor bar and festoon. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Crane Electrification
5 top-level lines as of r118657| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Conductor Bar System | overhead-crane-conductor-bar | 1× | 1 | · | part |
| 2 | Current Collector | overhead-crane-collector | 2× | 2 | · | part |
| 3 | Festoon Cable System | overhead-crane-festoon | 1× | 1 | · | part |
| 4 | Main Isolator Switch | overhead-crane-isolator | 1× | 1 | · | part |
| 5 | Wire Bundle | wire-bundle | 2× | 2 | · | part |