BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Base Frame

Assembly

Welded steel ground frame carrying the leg pivots, roller tracks, and powerpack, anchored to the slab or set in a pit so the lowered deck sits flush with the floor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Base Frame parts and their functions

4 top-level parts · 8 parts in total · full bill of materials below
Base Frame parts diagram: 1 base weldment, 2 anchor set, 3 leveling shim, 4 fork pocket. 8 parts in 4 top-level items.
Base Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Weldment 1× Base frame weldment
2 Anchor Set 1× Floor anchor bolts
3 Leveling Shim 4× Leveling shim packs
4 Fork Pocket 2× Forklift relocation pockets

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Base Frame

4 top-level lines · 4 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Weldment scissor-lift-table-base-weldment 1× 1 · part
2 Anchor Set scissor-lift-table-anchor-set 1× 1 · part
3 Leveling Shim scissor-lift-table-leveling-shim 4× 4 · part
4 Fork Pocket scissor-lift-table-fork-pocket 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the base frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks