Scissor Mechanism
AssemblyTwo parallel pairs of welded steel legs crossing at a center pivot: one leg end pins to the frame, the other rolls along a track, so cylinder force opening the scissor raises the platform. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Scissor Mechanism parts and their functions
7 top-level parts · 24 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Inner Leg | 2× | Inner leg weldments |
| 2 | Outer Leg | 2× | Outer leg weldments |
| 3 | Center Pivot | 2× | Center pivot pins |
| 4 | Roller Track | 4× | Roller end tracks |
| 5 | Track Roller | 4× | Leg end rollers |
| 6 | Pivot Bushing | 8× | Pivot bushings |
| 7 | Cross Tube | 2× | Leg tie tubes |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Scissor Mechanism
7 top-level lines · 7 rows shown · 24 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Inner Leg | scissor-lift-table-inner-leg | 2× | 2 | · | part |
| 2 | Outer Leg | scissor-lift-table-outer-leg | 2× | 2 | · | part |
| 3 | Center Pivot | scissor-lift-table-center-pivot | 2× | 2 | · | part |
| 4 | Roller Track | scissor-lift-table-roller-track | 4× | 4 | · | part |
| 5 | Track Roller | scissor-lift-table-track-roller | 4× | 4 | · | part |
| 6 | Pivot Bushing | scissor-lift-table-pivot-bush | 8× | 8 | · | part |
| 7 | Cross Tube | scissor-lift-table-cross-tube | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the scissor mechanism is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |