BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Printing Unit

Assembly

One color station with its plate, blanket, and impression cylinders and the ink and damp rollers that feed them. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Printing Unit parts and their functions

7 top-level parts · 81 parts in total · full bill of materials below
Printing Unit parts diagram: 1 plate cylinder, 2 blanket cylinder, 3 impression cylinder, 4 ink roller train, 5 dampening roller train, 6 ink fountain, 7 ball bearing. 81 parts in 7 top-level items.
Printing Unit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Plate Cylinder 3 parts 1× Plate cylinder
2 Blanket Cylinder 2 parts 1× Blanket cylinder
3 Impression Cylinder 2 parts 1× Impression cylinder
4 Ink Roller Train 3 parts 1× Ink roller train
5 Dampening Roller Train 3 parts 1× Dampening roller train
6 Ink Fountain 2 parts 1× Ink fountain
7 Ball Bearing 6× Cylinder bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Printing Unit

7 top-level lines · 22 rows shown · 81 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Plate Cylinder 3 parts sheet-fed-offset-press-plate-cylinder 1× 1 4 assembly
1.1 Printing Plate sheet-fed-offset-press-printing-plate 1× 1 · part
1.2 Plate Clamp sheet-fed-offset-press-plate-clamp 2× 2 · part
1.3 Register Adjuster sheet-fed-offset-press-register-adjuster 1× 1 · part
2 Blanket Cylinder 2 parts sheet-fed-offset-press-blanket-cylinder 1× 1 3 assembly
2.1 Rubber Blanket sheet-fed-offset-press-rubber-blanket 1× 1 · part
2.2 Blanket Bar sheet-fed-offset-press-blanket-bar 2× 2 · part
3 Impression Cylinder 2 parts sheet-fed-offset-press-impression-cylinder 1× 1 13 assembly
3.1 Gripper Bar sheet-fed-offset-press-gripper-bar 1× 1 · part
3.2 Gripper Finger sheet-fed-offset-press-gripper-finger 12× 12 · part
4 Ink Roller Train 3 parts sheet-fed-offset-press-ink-train 1× 1 19 assembly
4.1 Ink Roller sheet-fed-offset-press-ink-roller 12× 12 · part
4.2 Oscillating Roller sheet-fed-offset-press-oscillator-roller 3× 3 · part
4.3 Form Roller sheet-fed-offset-press-form-roller 4× 4 · part
5 Dampening Roller Train 3 parts sheet-fed-offset-press-damp-train 1× 1 3 assembly
5.1 Fountain Roller sheet-fed-offset-press-fountain-roller 1× 1 · part
5.2 Metering Roller sheet-fed-offset-press-metering-roller 1× 1 · part
5.3 Dampening Form Roller sheet-fed-offset-press-damp-form-roller 1× 1 · part
6 Ink Fountain 2 parts sheet-fed-offset-press-ink-fountain 1× 1 33 assembly
6.1 Fountain Blade sheet-fed-offset-press-fountain-blade 1× 1 · part
6.2 Ink Key sheet-fed-offset-press-ink-key 32× 32 · part
7 Ball Bearing ball-bearing 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the printing unit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks