BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Overlap Conveyor

Assembly

Slows and overlaps the cut sheets into a shingle so they stack cleanly. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Overlap Conveyor parts and their functions

6 top-level parts · 17 parts in total · full bill of materials below
Overlap Conveyor parts diagram: 1 vacuum belt, 2 conveyor roll, 3 vacuum box, 4 vacuum fan, 5 drive belt, 6 ball bearing. 17 parts in 6 top-level items.
Overlap Conveyor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vacuum Belt 1× Vacuum slowdown belt
2 Conveyor Roll 4× Conveyor rolls
3 Vacuum Box 1× Belt vacuum box
4 Vacuum Fan 1× Vacuum fan
5 Drive Belt 2× Conveyor belts
6 Ball Bearing 8× Roll bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Overlap Conveyor

6 top-level lines · 6 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vacuum Belt sheeting-machine-vacuum-belt 1× 1 · part
2 Conveyor Roll sheeting-machine-conveyor-roll 4× 4 · part
3 Vacuum Box sheeting-machine-vacuum-box 1× 1 · part
4 Vacuum Fan sheeting-machine-vacuum-fan 1× 1 · part
5 Drive Belt drive-belt 2× 2 · part
6 Ball Bearing ball-bearing 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the overlap conveyor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks