Slat Conveyor Bed
AssemblyThe moving deck of slats that carries items along, each slat slotted to guide a sliding shoe across it. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Slat Conveyor Bed parts and their functions
4 top-level parts · 2,740 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Conveyor Slat | 300× | Conveyor slats |
| 2 | Slat Chain 3 parts | 2× | Slat chains |
| 3 | Wear Strip | 40× | Wear strips |
| 4 | Slat Bearing | 600× | Slat bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Slat Conveyor Bed
4 top-level lines · 7 rows shown · 2,740 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Conveyor Slat | shoe-sorter-slat | 300× | 300 | · | part |
| 2 | Slat Chain 3 parts | shoe-sorter-slat-chain | 2× | 2 | 900 | assembly |
| 2.1 | Chain Link | shoe-sorter-chain-link | 300× | 600 | · | part |
| 2.2 | Chain Pin | shoe-sorter-chain-pin | 300× | 600 | · | part |
| 2.3 | Chain Roller | shoe-sorter-chain-roller | 300× | 600 | · | part |
| 3 | Wear Strip | shoe-sorter-wear-strip | 40× | 40 | · | part |
| 4 | Slat Bearing | shoe-sorter-slat-bearing | 600× | 600 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the slat conveyor bed is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |