BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Track Loop

Assembly

The closed oval or circuit of rail that the tray carriers circulate on past the induction points and the chutes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Track Loop parts and their functions

5 top-level parts · 229 parts in total · full bill of materials below
Track Loop parts diagram: 1 rail section, 2 curve section, 3 support leg, 4 rail joint, 5 fastener set. 229 parts in 5 assemblies.
Track Loop parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Rail Section 80× Rail sections
2 Curve Section Curve sections
3 Support Leg 60× Support legs
4 Rail Joint 80× Rail joints
5 Fastener Set Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Track Loop

5 top-level lines · 5 rows shown · 229 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Rail Section tilt-tray-sorter-rail-section 80× 80 · part
2 Curve Section tilt-tray-sorter-curve-section 8 · part
3 Support Leg tilt-tray-sorter-support-leg 60× 60 · part
4 Rail Joint tilt-tray-sorter-rail-joint 80× 80 · part
5 Fastener Set fastener-set 1 · part

Where the track loop is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks