BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Operator Station

Assembly

The driving position: a sprung stand-on platform or fold-down seat, a tiller carrying the throttle and direction switch, and a color display for speed, battery, and faults. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Station parts and their functions

5 top-level parts · 63 parts in total · full bill of materials below
Operator Station parts diagram: 1 operator platform, 2 seat, 3 steering tiller, 4 operator display, 5 presence switch. 63 parts in 5 top-level items.
Operator Station parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Operator Platform 1× Operator platform
2 Seat 1× Fold-down seat
3 Steering Tiller 4 parts 1× Steering tiller
4 Operator Display 5 parts 1× Operator display
5 Presence Switch 1× Operator-presence switch

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Station

5 top-level lines · 14 rows shown · 63 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Operator Platform tow-tractor-platform 1× 1 · part
2 Seat tow-tractor-seat 1× 1 · part
3 Steering Tiller 4 parts tow-tractor-tiller 1× 1 5 assembly
3.1 Tiller Head tow-tractor-tiller-head 1× 1 · part
3.2 Hall Sensor hall-sensor 1× 1 · part
3.3 Bare PCB pcb-bare 1× 1 · part
3.4 Connector connector 2× 2 · part
4 Operator Display 5 parts tow-tractor-display 1× 1 55 assembly
4.1 LCD Panel lcd-panel 1× 1 · part
4.2 Bare PCB pcb-bare 1× 1 · part
4.3 Microcontroller mcu 1× 1 · part
4.4 SMD Passive (R/C/L) smd-passives 50× 50 · part
4.5 Connector connector 2× 2 · part
5 Presence Switch tow-tractor-presence-switch 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the operator station is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks