Overhead Track
AssemblyThe continuous I-beam or formed-steel track that the trolley wheels ride on, hung from the building roof. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Overhead Track parts and their functions
5 top-level parts · 281 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Track Section | 60× | Track sections |
| 2 | Track Joint | 60× | Track joints |
| 3 | Hanger Rod | 80× | Hanger rods |
| 4 | Support Bracket | 80× | Support brackets |
| 5 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Overhead Track
5 top-level lines · 5 rows shown · 281 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Track Section | trolley-conveyor-track-section | 60× | 60 | · | part |
| 2 | Track Joint | trolley-conveyor-track-joint | 60× | 60 | · | part |
| 3 | Hanger Rod | trolley-conveyor-hanger-rod | 80× | 80 | · | part |
| 4 | Support Bracket | trolley-conveyor-support-bracket | 80× | 80 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the overhead track is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |