BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Level System

Assembly

Probes that sense the rising pile and stop loading at full so the truck is not overfilled. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Level System parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Level System parts diagram: 1 capacitance probe, 2 tilt paddle switch, 3 radar level sensor. 3 parts in 3 top-level items.
Level System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Capacitance Probe 1× Probe at the cone tip detecting when material reaches the spout, triggering the spout to lift.
2 Tilt Paddle Switch 1× Hanging paddle that tilts when buried by the pile, signaling the truck is full and stopping the feed.
3 Radar Level Sensor 1× Non-contact radar profiling the pile height across the truck bed for even loading.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Level System

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Capacitance Probe truck-loading-spout-level-probe 1× 1 · part
2 Tilt Paddle Switch truck-loading-spout-tilt-switch 1× 1 · part
3 Radar Level Sensor truck-loading-spout-radar-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the level system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks