BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Load Handling Device

Assembly

Telescopic pallet fork extending from the carriage into a storage cell. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Load Handling Device parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Load Handling Device parts diagram: 1 telescopic fork, 2 fork drive, 3 fork lift cylinder, 4 pallet sensor, 5 linear guide rail. 9 parts in 5 top-level items.
Load Handling Device parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Telescopic Fork 1× Three-stage telescopic pallet fork
2 Fork Drive 1× Drive extending and retracting the fork
3 Fork Lift Cylinder 1× Short lift stroke seating the pallet
4 Pallet Sensor 4× Sensors confirming pallet position and overhang
5 Linear Guide Rail 2× Telescope linear guides

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Load Handling Device

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Telescopic Fork unit-load-asrs-telescopic-fork 1× 1 · part
2 Fork Drive unit-load-asrs-fork-drive 1× 1 · part
3 Fork Lift Cylinder unit-load-asrs-fork-lift-cylinder 1× 1 · part
4 Pallet Sensor unit-load-asrs-pallet-sensor 4× 4 · part
5 Linear Guide Rail linear-guide 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the load handling device is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks