Control Handle
AssemblySingle-hand operating unit at the tube base; a lever valve modulates vacuum to set lift height and release. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control Handle parts and their functions
7 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Lift Control Valve | 1× | lift/lower proportional valve |
| 2 | Handle Grip | 1× | Ergonomic grip placing lift lever and release trigger under one hand. |
| 3 | Release Trigger | 1× | two-action load release |
| 4 | Bleed Port | 1× | ambient air admission |
| 5 | Handle Hub | 1× | tube-to-foot junction body |
| 6 | Vacuum Gauge | 1× | grip pressure indication |
| 7 | Rotation Grip | 1× | load spin control |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control Handle
7 top-level lines · 7 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lift Control Valve | vacuum-lifter-control-valve | 1× | 1 | · | part |
| 2 | Handle Grip | vacuum-lifter-handle-grip | 1× | 1 | · | part |
| 3 | Release Trigger | vacuum-lifter-release-trigger | 1× | 1 | · | part |
| 4 | Bleed Port | vacuum-lifter-bleed-port | 1× | 1 | · | part |
| 5 | Handle Hub | vacuum-lifter-handle-hub | 1× | 1 | · | part |
| 6 | Vacuum Gauge | vacuum-lifter-vacuum-gauge | 1× | 1 | · | part |
| 7 | Rotation Grip | vacuum-lifter-rotation-grip | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the control handle is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |