Tie-In Points
AssemblyTwo reinforced webbing loops, one on the waist belt, one on the leg-loop bridge, through which the rope is tied directly. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Tie-In Points
3 top-level lines as of r30267| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Upper Tie-In Point | climbing-harness-upper-tie-in | 1× | 1 | · | part |
| 2 | Lower Tie-In Point | climbing-harness-lower-tie-in | 1× | 1 | · | part |
| 3 | Tie-In Wear Sheath | climbing-harness-wear-sheath | 2× | 2 | · | part |