Cross-Belt Carriers
AssemblyThe train of carts, each carrying a short powered belt set crosswise to the travel direction. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cross-Belt Carriers parts and their functions
4 top-level parts · 3,600 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Carrier Cart 4 parts | 200× | Carrier carts |
| 2 | Cart Coupling | 200× | Cart couplings |
| 3 | Running Wheel | 800× | Running wheels |
| 4 | Guide Wheel | 400× | Guide wheels |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cross-Belt Carriers
4 top-level lines · 8 rows shown · 3,600 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Carrier Cart 4 parts | cross-belt-sorter-carrier-cart | 200× | 200 | 11 | assembly |
| 1.1 | Cart Frame | cross-belt-sorter-cart-frame | 1× | 200 | · | part |
| 1.2 | Running Wheel | cross-belt-sorter-running-wheel | 4× | 800 | · | part |
| 1.3 | Ball Bearing | ball-bearing | 4× | 800 | · | part |
| 1.4 | Guide Wheel | cross-belt-sorter-guide-wheel | 2× | 400 | · | part |
| 2 | Cart Coupling | cross-belt-sorter-coupling | 200× | 200 | · | part |
| 3 | Running Wheel | cross-belt-sorter-running-wheel | 800× | 800 | · | part |
| 4 | Guide Wheel | cross-belt-sorter-guide-wheel | 400× | 400 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cross-belt carriers is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |