BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Content Management System

Assembly

Server hardware with scheduling software, network interface, and media storage for remote playlist updates. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Content Management System parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Content Management System parts diagram: 1 media player SoC, 2 media storage SSD, 3 network interface, 4 power supply, 5 bare PCB. 5 parts in 5 top-level items.
Content Management System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Media Player SoC 1× Linux-based ARM SoC with 4K decoding
2 Media Storage SSD 1× SSD for video library
3 Network Interface 1× Ethernet for updates
4 Power Supply 1× 48V 500W for player
5 Bare PCB 1× Scheduling control board

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Content Management System

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Media Player SoC digital-billboard-media-player 1× 1 · part
2 Media Storage SSD digital-billboard-storage 1× 1 · part
3 Network Interface digital-billboard-network-module 1× 1 · part
4 Power Supply power-supply 1× 1 · part
5 Bare PCB pcb-bare 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the content management system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks