BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Impact Screen Assembly

Assembly

Heavy-duty fabric screen that absorbs ball impact energy and enables ball return collection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Impact Screen Assembly parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Impact Screen Assembly parts diagram: 1 screen fabric, 2 screen frame, 3 ball return chute, 4 shock absorber. 7 parts in 4 top-level items.
Impact Screen Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Screen Fabric 1× High-tension woven nylon blend, 7 mm thickness
2 Screen Frame 1× Steel frame with tension rods and ball-bearing pulleys
3 Ball Return Chute 1× Curved metal chute returning balls to hopper
4 Shock Absorber 4× Pneumatic shock absorbers at frame base

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Impact Screen Assembly

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Screen Fabric golf-simulator-screen-fabric 1× 1 · part
2 Screen Frame golf-simulator-screen-frame 1× 1 · part
3 Ball Return Chute golf-simulator-ball-return-chute 1× 1 · part
4 Shock Absorber golf-simulator-shock-absorber 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the impact screen assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳BOE
boe.com ↗
Beijing, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Tianma
tianma.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳TCL CSOT
szcsot.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Truly Opto
truly.net ↗
Shanwei, CN Displays & camera modules 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks