BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Clean (Output) Water Bag

Assembly

Lower collection bag storing filtered water after passing through membrane. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Clean (Output) Water Bag parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Clean (Output) Water Bag parts diagram: 1 clean bag nylon fabric, 2 clean bag spigot valve, 3 clean bag inlet connector. 3 parts in 3 top-level items.
Clean (Output) Water Bag parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Clean Bag Nylon Fabric 1× Food-grade nylon, 0.3 mm, 8–12 L capacity, collapsible design
2 Clean Bag Spigot Valve 1× Spigot valve allowing convenient water dispensing
3 Clean Bag Inlet Connector 1× Barbed fitting connecting output hose to bag port

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Clean (Output) Water Bag

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Clean Bag Nylon Fabric gravity-water-filter-clean-bag-nylon 1× 1 · part
2 Clean Bag Spigot Valve gravity-water-filter-clean-bag-tap 1× 1 · part
3 Clean Bag Inlet Connector gravity-water-filter-clean-bag-connector 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the clean (output) water bag is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks