BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Upper Assembly

Assembly

Combination full-grain leather panels and synthetic nylon overlays providing structural rigidity and abrasion resistance. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Upper Assembly parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Upper Assembly parts diagram: 1 leather vamp, 2 ankle cuff, 3 side panel, 4 collar padding, 5 heel tab, 6 fastener set. 7 parts in 6 top-level items.
Upper Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Leather Vamp 1× Full-grain leather forefoot and toe
2 Ankle Cuff 1× Synthetic ankle cuff reinforcement
3 Side Panel 2× Leather or synthetic side gussets
4 Collar Padding 1× Foam ankle cushioning
5 Heel Tab 1× Pull-down heel tab
6 Fastener Set 1× Stitching and adhesive kit

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Upper Assembly

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Leather Vamp hiking-boot-leather-vamp 1× 1 · part
2 Ankle Cuff hiking-boot-nylon-cuff 1× 1 · part
3 Side Panel hiking-boot-side-panels 2× 2 · part
4 Collar Padding hiking-boot-collar-padding 1× 1 · part
5 Heel Tab hiking-boot-heel-tab 1× 1 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the upper assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks