Seat Balance Monitoring
AssemblyPressure and acceleration sensors detecting rider center-of-gravity and seat security. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Seat Balance Monitoring parts and their functions
3 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Saddle Pressure Array | 1× | 8-zone pressure pad array |
| 2 | Rider IMU | 1× | 9-axis IMU measuring rider lean and balance |
| 3 | Stirrup Load Cell | 2× | Load cells in stirrups detecting leg position |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Seat Balance Monitoring
3 top-level lines · 3 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Saddle Pressure Array | horse-riding-simulator-saddle-pressure-sensor | 1× | 1 | · | part |
| 2 | Rider IMU | horse-riding-simulator-imu-module | 1× | 1 | · | part |
| 3 | Stirrup Load Cell | horse-riding-simulator-stirrup-force-sensor | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the seat balance monitoring is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BOE
boe.com ↗
|
Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳Tianma
tianma.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳TCL CSOT
szcsot.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |