BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Kayak Support Cradles

Assembly

Padded V-shaped or curved supports cradling kayak hull. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Kayak Support Cradles parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Kayak Support Cradles parts diagram: 1 cradle arm, 2 cradle spacing adjustment, 3 cradle pivot mount, 4 cradle padding. 5 parts in 4 top-level items.
Kayak Support Cradles parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cradle Arm 2× Left and right curved arms supporting kayak sides
2 Cradle Spacing Adjustment 1× Adjustable spacing accommodating different kayak widths
3 Cradle Pivot Mount 1× Pivot mount allowing cradle angle adjustment
4 Cradle Padding 1× Closed-cell foam or rubber protecting hull

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Kayak Support Cradles

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cradle Arm kayak-cart-cradle-arms 2× 2 · part
2 Cradle Spacing Adjustment kayak-cart-cradle-spacing 1× 1 · part
3 Cradle Pivot Mount kayak-cart-cradle-pivot 1× 1 · part
4 Cradle Padding kayak-cart-cradle-padding 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the kayak support cradles is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks