BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Frame Assembly

Assembly

Lightweight aluminum or steel chassis with handle grips. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame Assembly parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Frame Assembly parts diagram: 1 frame tubing, 2 frame joints, 3 handle grip, 4 frame reinforcement. 5 parts in 4 top-level items.
Frame Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Frame Tubing 1× Welded aluminum or steel (1.5 inch diameter)
2 Frame Joints 1× Welded or bolted T-joints and corners
3 Handle Grip 2× Molded or foam-wrapped handles for push/pull
4 Frame Reinforcement 1× Diagonal bracing for rigidity under load

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame Assembly

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Frame Tubing kayak-cart-frame-tubing 1× 1 · part
2 Frame Joints kayak-cart-frame-joints 1× 1 · part
3 Handle Grip kayak-cart-handle-grips 2× 2 · part
4 Frame Reinforcement kayak-cart-frame-reinforcement 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the frame assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks