Load and Free Trolleys
AssemblyThe carriers that hang the load and run on the free track, picked up and dropped by pusher dogs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Load and Free Trolleys parts and their functions
5 top-level parts · 640 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Load Trolley 3 parts | 40× | Load trolleys |
| 2 | Front Trolley 3 parts | 40× | Front trolleys |
| 3 | Rear Trolley 2 parts | 40× | Rear trolleys |
| 4 | Load Bar | 40× | Load bars |
| 5 | Carrier Hook | 80× | Carrier hooks |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Load and Free Trolleys
5 top-level lines · 13 rows shown · 640 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Load Trolley 3 parts | overhead-power-and-free-conveyor-load-trolley | 40× | 40 | 5 | assembly |
| 1.1 | Trolley Wheel | overhead-power-and-free-conveyor-trolley-wheel | 2× | 80 | · | part |
| 1.2 | Ball Bearing | ball-bearing | 2× | 80 | · | part |
| 1.3 | Trolley Bracket | overhead-power-and-free-conveyor-trolley-bracket | 1× | 40 | · | part |
| 2 | Front Trolley 3 parts | overhead-power-and-free-conveyor-front-trolley | 40× | 40 | 4 | assembly |
| 2.1 | Trolley Wheel | overhead-power-and-free-conveyor-trolley-wheel | 2× | 80 | · | part |
| 2.2 | Engaging Dog | overhead-power-and-free-conveyor-engaging-dog | 1× | 40 | · | part |
| 2.3 | Coil Spring | coil-spring | 1× | 40 | · | part |
| 3 | Rear Trolley 2 parts | overhead-power-and-free-conveyor-rear-trolley | 40× | 40 | 4 | assembly |
| 3.1 | Trolley Wheel | overhead-power-and-free-conveyor-trolley-wheel | 2× | 80 | · | part |
| 3.2 | Ball Bearing | ball-bearing | 2× | 80 | · | part |
| 4 | Load Bar | overhead-power-and-free-conveyor-load-bar | 40× | 40 | · | part |
| 5 | Carrier Hook | overhead-power-and-free-conveyor-carrier-hook | 80× | 80 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the load and free trolleys is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |