BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mast Assembly

Assembly

Two-stage telescoping mast with fork carriage, forks, lift chains, and rollers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mast Assembly parts and their functions

6 top-level parts · 23 parts in total · full bill of materials below
Mast Assembly parts diagram: 1 mast channel rail, 2 fork carriage, 3 fork tine, 4 lift chain, 5 mast roller, 6 ball bearing. 23 parts in 6 top-level items.
Mast Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mast Channel Rail 2× Inner + outer channel rails
2 Fork Carriage 1× Welded carriage plate that rides the mast and carries the forks.
3 Fork Tine 2× Forged steel load fork.
4 Lift Chain 2× Leaf lift chains
5 Mast Roller 8× Carriage + stage rollers
6 Ball Bearing 8× Roller bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mast Assembly

6 top-level lines · 6 rows shown · 23 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mast Channel Rail pallet-stacker-mast-rail 2× 2 · part
2 Fork Carriage pallet-stacker-fork-carriage 1× 1 · part
3 Fork Tine pallet-stacker-fork-tine 2× 2 · part
4 Lift Chain pallet-stacker-lift-chain 2× 2 · part
5 Mast Roller pallet-stacker-mast-roller 8× 8 · part
6 Ball Bearing ball-bearing 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the mast assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks