Main Body
AssemblyThe primary aluminum housing containing the rope channel and bearing bosses. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Main Body
3 top-level lines as of r137476| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Body Casting | rappel-descender-body-casting | 1× | 1 | · | part |
| 2 | Guide Rail | rappel-descender-guide-rail | 2× | 2 | · | part |
| 3 | Fastener Set | fastener-set | 1× | 1 | · | part |