Fasteners and Locking Hardware
AssemblyStainless steel bolts, hinges, lock mechanisms, and weatherproofing gaskets. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Fasteners and Locking Hardware parts and their functions
5 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Hinge Bolts | 1× | M8–M10 stainless bolts with threadlock compound |
| 2 | Central Lock Mechanism | 1× | Push-button or key-operated central lock |
| 3 | Secondary Pin Lock | 1× | Child-safety pin lock preventing accidental lid drop |
| 4 | Gasket Strips | 1× | Rubber or silicone gasket strips at shell seams |
| 5 | Roof Rail Bolts | 8× | Clamp bolts (M8–M10) securing brackets to roof rails |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Fasteners and Locking Hardware
5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hinge Bolts | roof-cargo-box-hinge-bolt-set | 1× | 1 | · | part |
| 2 | Central Lock Mechanism | roof-cargo-box-lock-mechanism | 1× | 1 | · | part |
| 3 | Secondary Pin Lock | roof-cargo-box-secondary-lock | 1× | 1 | · | part |
| 4 | Gasket Strips | roof-cargo-box-gasket-material | 1× | 1 | · | part |
| 5 | Roof Rail Bolts | roof-cargo-box-mounting-bolts | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the fasteners and locking hardware is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.01–$2. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sundram.com ↗ | Chennai, IN | Fasteners | 10,000 pcs | 3–5 wks |
| lpsindia.com ↗ | Rohtak, IN | Fasteners | 10,000 pcs | 3–5 wks |
| escort-fastener.com ↗ | Suzhou, CN | Fasteners | 10,000 pcs | 3–5 wks |
| tbfastener.com ↗ | Shanghai, CN | Fasteners | 10,000 pcs | 3–5 wks |
| sterlingtools.in ↗ | Faridabad, IN | Fasteners | 10,000 pcs | 3–5 wks |