Molded Body Shell
AssemblyAerodynamic polyethylene or fiberglass two-piece hull, 150–250 L capacity, 170–230 cm length. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Molded Body Shell parts and their functions
4 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Upper Shell Half | 1× | Upper molded half, ~80 L volume |
| 2 | Lower Shell Half | 1× | Lower molded half, ~80 L volume, tapered nose for aerodynamics |
| 3 | Shell Material Specification | 1× | UV-resistant polyethylene or fiberglass composite, 3–4 mm thickness |
| 4 | Corner Reinforcement Gussets | 4× | Welded or glued reinforcement at shell corners |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Molded Body Shell
4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Upper Shell Half | roof-cargo-box-shell-top | 1× | 1 | · | part |
| 2 | Lower Shell Half | roof-cargo-box-shell-bottom | 1× | 1 | · | part |
| 3 | Shell Material Specification | roof-cargo-box-shell-material | 1× | 1 | · | part |
| 4 | Corner Reinforcement Gussets | roof-cargo-box-corner-reinforcement | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the molded body shell is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |