BOMwiki the bill-of-materials encyclopedia
30,390,942 parts mapped · 192,471 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Cuff

Assembly

Upper shell surrounding the calf, providing lateral support and controlled flex. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cuff parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Cuff parts diagram: 1 cuff shell, 2 cuff pivot, 3 cuff adjustment. 3 parts in 3 assemblies.
Cuff parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cuff Shell Upper polymer component
2 Cuff Pivot Hinge point for forward flex
3 Cuff Adjustment Cuff-forward lever for flex control

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cuff

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cuff Shell ski-boot-cuff-shell 1 · part
2 Cuff Pivot ski-boot-cuff-pivot 1 · part
3 Cuff Adjustment ski-boot-cuff-adjustment 1 · part

Where the cuff is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks