BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Insulation System

Assembly

Goose down held in fabric-walled chambers (box baffles) that keep the fill evenly distributed over the body. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Insulation System parts and their functions

4 top-level parts · 30 parts in total · full bill of materials below
Insulation System parts diagram: 1 goose down fill (800 FP), 2 baffle wall, 3 footbox chamber, 4 fill port closure. 30 parts in 4 top-level items.
Insulation System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Goose Down Fill (800 FP) 1× 450 g of 800-FP down
2 Baffle Wall 14× Mesh chamber walls
3 Footbox Chamber 1× Overstuffed foot chamber
4 Fill Port Closure 14× Chamber closure seams

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Insulation System

4 top-level lines · 4 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Goose Down Fill (800 FP) sleeping-bag-down-fill 1× 1 · part
2 Baffle Wall sleeping-bag-baffle-wall 14× 14 · part
3 Footbox Chamber sleeping-bag-footbox-chamber 1× 1 · part
4 Fill Port Closure sleeping-bag-fill-port-stitch 14× 14 · part

Something wrong in this list? Report a problem with this BOM.

Where the insulation system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks