BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tray Carriers

Assembly

The continuous train of small carts, each holding one tilting tray, joined so they move as one loop. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tray Carriers parts and their functions

4 top-level parts · 3,400 parts in total · full bill of materials below
Tray Carriers parts diagram: 1 carrier cart, 2 tray, 3 cart coupling, 4 running wheel. 3,400 parts in 4 top-level items.
Tray Carriers parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Carrier Cart 4 parts 200× Carrier carts
2 Tray 200× Trays
3 Cart Coupling 200× Cart couplings
4 Running Wheel 800× Running wheels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tray Carriers

4 top-level lines · 8 rows shown · 3,400 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Carrier Cart 4 parts tilt-tray-sorter-carrier-cart 200× 200 11 assembly
1.1 Cart Frame tilt-tray-sorter-cart-frame 1× 200 · part
1.2 Running Wheel tilt-tray-sorter-running-wheel 4× 800 · part
1.3 Ball Bearing ball-bearing 4× 800 · part
1.4 Guide Wheel tilt-tray-sorter-guide-wheel 2× 400 · part
2 Tray tilt-tray-sorter-tray 200× 200 · part
3 Cart Coupling tilt-tray-sorter-coupling 200× 200 · part
4 Running Wheel tilt-tray-sorter-running-wheel 800× 800 · part

Something wrong in this list? Report a problem with this BOM.

Where the tray carriers is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks