BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tip & Basket Assembly

Assembly

Tungsten-carbide tip in a moulded holder with a threaded boss for interchangeable trekking, mud, and snow baskets. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tip & Basket Assembly parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Tip & Basket Assembly parts diagram: 1 carbide tip, 2 tip body, 3 trekking basket, 4 snow basket, 5 rubber tip protector. 5 parts in 5 top-level items.
Tip & Basket Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Carbide Tip 1× Sintered insert
2 Tip Body 1× Moulded holder
3 Trekking Basket 1× 38 mm standard
4 Snow Basket 1× 95 mm winter
5 Rubber Tip Protector 1× Pavement / Leave-no-trace

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tip & Basket Assembly

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Carbide Tip trekking-pole-carbide-tip 1× 1 · part
2 Tip Body trekking-pole-tip-body 1× 1 · part
3 Trekking Basket trekking-pole-trekking-basket 1× 1 · part
4 Snow Basket trekking-pole-snow-basket 1× 1 · part
5 Rubber Tip Protector trekking-pole-rubber-foot 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the tip & basket assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks