BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hoist Mechanism

Assembly

Winch and cables that raise and lower the spout to follow the rising material pile. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hoist Mechanism parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Hoist Mechanism parts diagram: 1 winch, 2 hoist cable, 3 cable drum, 4 hoist motor, 5 ball bearing. 8 parts in 5 top-level items.
Hoist Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Winch 1× Geared winch raising and lowering the spout at 3-6 m/min as the load builds.
2 Hoist Cable 3× Stainless wire rope, three carrying the spout symmetrically so it stays vertical.
3 Cable Drum 1× Grooved drum winding all three cables together at equal rate.
4 Hoist Motor 1× Gearmotor with brake driving the cable drum and holding position when stopped.
5 Ball Bearing 2× Deep-groove radial ball bearing.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hoist Mechanism

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Winch truck-loading-spout-winch 1× 1 · part
2 Hoist Cable truck-loading-spout-hoist-cable 3× 3 · part
3 Cable Drum truck-loading-spout-cable-drum 1× 1 · part
4 Hoist Motor truck-loading-spout-hoist-motor 1× 1 · part
5 Ball Bearing ball-bearing 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the hoist mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks