Bridge & Navigation
AssemblyForward and aft control stations with navigation, DP, and winch monitoring for anchor handling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Bridge & Navigation
5 top-level lines as of r4631| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Navigation Radar 5 parts | anchor-handling-tug-radar | 2× | 2 | 0 | assembly |
| 2 | ECDIS 4 parts | anchor-handling-tug-ecdis | 1× | 1 | 0 | assembly |
| 3 | DP Console 4 parts | anchor-handling-tug-dp-console | 1× | 1 | 0 | assembly |
| 4 | Aft Control Station 4 parts | anchor-handling-tug-aft-control | 1× | 1 | 0 | assembly |
| 5 | GMDSS Radio | anchor-handling-tug-gmdss | 1× | 1 | · | part |