Maintenance Access Port
AssemblyThreaded port allowing air bleeding and internal inspection without draining tunnel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Maintenance Access Port
2 top-level lines as of r5287| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Inspection Port | aquarium-acrylic-tunnel-port-body | 1× | 1 | · | part |
| 2 | Port Tapered Plug | aquarium-acrylic-tunnel-port-plug | 1× | 1 | · | part |